13-bed HMO conversion — The Freebird, ST5

A former pub being converted into thirteen letting rooms — steels, propping and structural alterations

Location
The Freebird Pub, ST5
Status
On site now
Steel beams and acrow props supporting the structure at the Freebird Pub during conversion works
13
Rooms planned
Live
Currently on site

The brief

A former public house being converted into thirteen letting rooms. Pub buildings have large open ground floors carrying the structure above on a handful of points, so creating room divisions means taking load somewhere it has never been before.

The challenge

Substantial structural alterations. New steel throughout to pick up walls that are being removed, extensive temporary propping while the permanent structure goes in, and the whole thing sequenced so nothing is ever unsupported.

The result

Currently on site. Steelwork and structural alterations are in progress — these photographs are from the live build rather than after the fact.

Where this one is up to

This is a live project, and these are photographs from the middle of it rather than a tidy set taken on handover day. We’ve put it on here on purpose.

Why a pub is harder than a house

A terraced house has load-bearing walls roughly where you’d expect. A pub has a big open ground floor with the structure above carried on a small number of points, because the whole design brief was to have as few things in the way of the bar as possible.

Converting that into thirteen rooms means putting walls back — and the load paths that made sense for a pub don’t line up with the ones a bedroom layout needs. So it becomes a steel job.

Temporary works

The photographs with rows of adjustable props are the part that matters. Every opening gets propped before anything is cut, the props stay in until the new steel is properly bearing and the padstone mortar has gone off, and openings are formed one at a time rather than all at once.

It’s slower. It’s also the difference between a structural alteration and a structural failure.

What’s next

Once the structure is complete the building moves on to fire compartmentation, services and room fit-out. A thirteen-bed building is a licensable HMO and, at this scale, the fire strategy is a genuine design exercise rather than a checklist.

We’ll add the finished photographs here as the job completes.

Next step

Want something like this doing?

Tell us roughly what you're after and roughly what you had in mind to spend. We'll come out and tell you honestly whether it works.

  • Free site visit, no obligation
  • Written itemised quote in 5 working days
  • We reply within one working day